The electrician will be here between 7:30 and 8:00 to do some rewiring in the ceiling and whatever else he needs to do before the cabinet installers arrive between 9:00 and 11:00 to install the cabinets. Then the drywall guy is coming between 3:00 and 4:00 to assess that project. I just cleared the kitchen out and did some cleaning.